Use and Care Manual

www.ellasbubbles.com
Final Inspecons ...connued.
An extension box is used to extend the length of your Ella Walk in Bath to a 60” length. Some
installaons require trimming the extension box. Cung the extension pieces should be
done with a reciprocang saw; a progressive blade is best or a bimetal blade will work as
well.
Measure the distance between the wall and the Walk in Bath by the three corners and at the
middle of each length so as to detect any variance in the shape of the wall.
Use masking tape to cover where the cut will be made and then make your marks on the
tape. Trim the pieces while cung through the tape to ensure a clean cut.
REMEMBER: Make sure your measurements are correct before making final cut.
Some installaons may use trim molding along the boom. Use Silicone to adhere the mold-
ing to your Walk in Bath.
17
Finishing Installaon
Before filling your Ella Walk in Bath with water, be sure to wipe down the door seal and the
surrounding surface of the door jam. Use a damp washcloth to remove any debris, construc-
on dust and oils that may prevent the seal from working properly.
Fill your Ella Walk in Bath with water. Aer at least 5 minutes check the installaon for leaks
along the door seam and plumbing connecons.
If applicable, Turn on the pump and or blower, let it run for at least 5 minutes. Check again
for leaks while the equipment is sll running. Check by hand where visual inspecons are not
possible.