Installation Guide
Gelcoat Shower and Tub Shower
Installation Instructions
CARE AND CLEANING
Do not use caustic or abrasive cleaners on the unit. 
Avoid harsh abrasive or gritty scouring powders.To 
clean the unit, simply use a household liquid detergent 
with a soft sponge or cloth and warm water. More 
persistent stains,tar, or paint can be removed with 
mineral spirits. Remove excess plaster by scraping with 
a sharpened soft wood stick. Avoid wire brushes, metal 
scrapers or tools. Restore dull areas by rubbing with an 
automotive type body cleaning compound.
wall of the unit or in the wall above. Measure and mark 
using the appropriate size hole saw.
4. 
on unit according to the manufacturers instructions. Apply 
a bead of silicone caulk, or plumber’s putty around the 
5.  Now move unit into place. Position the unit at
the open end of the framed pocket. Align the lower edge 
of the apron in approximate position and tilt back into 
place.
6.  Plumb and level the unit in two directions: Place
a level on top of the apron or shower dam and along 
provided shims under the unit as described the Pre-
Installation Planning section.
7.  Place shims under the unit after it is put into place and 
as it is being leveled. Apply an adhesive to the bottom 
of each shim to permanenty secure into place. To ensure 
shims must be used on each unit. See Figure 4 for 
additional details.
8.  If there is any space between the bottom of the apron 
leveling compound.
9.  Mount unit to framing with 6d galvanized nails 
vertically, and to all studs horizontally. Drilling holes for 
fasteners is recommended. 
10.  Make connections to supply and drain lines. Strap all 
.
11.  Install wallboard along unit. Wallboard should
mounting screws or nails.  See Figure 5
CAUTION 
Use of a RUBBER FLOOR MAT is not recommended, 
however, if you choose to do so, please remove after each 
use and dry both the mat and the unit. Use of a
 rubber 
void your warranty.
Support Wedges
Place Support Wedges
Figure 4
Place the shims under the bottom back edge of
the unit after it is put into place and leveled.
Apply an adhesive to the bottom of each shim to
permanenty secure it in place. A minimum of two
shims must be used on each unit  to ensure
proper support and a solid base.
Wallboard
Small Gap
Apply Caulking
Framing
Studs
Install and Finish Wall Board
Shower Wall
Fasteners
At Studs
Figure 5
Install wallboard so it covers the mounting flanges of
the  bathing  unit. Leave  a  small  gap  between  the
finished  surface  of  the  bathing  unit  and  edge  of  the
 e gap.ht llif ot gnikluac ylppA  .draob llaw
Fasten wallboard to framing studs. Tape seams and
finish wall board as typical.
  Praxis Companies LLC
  435 Industrial Road I Savannah, Tennessee 38372 I Tel: (800) 443 7269 I Fax: (731) 925 0379 
  www.praxiscompanies.com
Praxis Companies, LLC Copyright 2010    PN /0410/GCG
www.ellasbubbles.com


