User's Manual

Chapter Four Configuration
man_905_2.1.doc Page 41
From the Communication menu, select “Program The 105”
The configuration program will now attempt to download the configuration data to the module. If all
goes well, a “Programming” prompt will appear. This prompt will remain until programming of the is
complete. If the is not correctly connected, or is not turned on, it may take up to a minute for the
configuration program to stop trying to connect to the .
Loading existing Configuration from the
To download the configuration from a for editing or simply for checking, follow the following steps:
Connect the cable from the PC’s serial port to the serial port.
From the Communication menu, select “Select Comms Port”
Select the appropriate serial port from the list provided (COM1 - COM4)
From the Communication menu, select “Load Config from 105”
The configuration program will now attempt to upload the configuration data from the . If all goes
well, a “Loading” prompt will appear. This prompt will remain until loading of data from the is
complete. If the is not correctly connected, or is not turned on, it may take up to a minute for the
configuration program to stop trying to connect to the .