Use and Care Manual

Page 20
SECTION 5
STARTUP AND OPERATION
5.1 INITIAL STARTUP
Ensure a suitable supply of compressed air between
4,1 bar (60 psi g) and 16 bar (230 psi g) pressure is
available and check that the dryer cannot be
overflowed.
IMPORTANT NOTE
Control air pressure is to be below 10 bars. If the
working pressure is above 10 bars then use a pressure
regulator and set it below 10 bars. (Pressure regulator
is not supplied with the dryer.) Inlet temperature must
be between 4.4°C (40°F) to 49°C (120°F) at all times.
IMPORTANT NOTE
Ensure all valves are opened and closed gradually.
Proceed as follows: (Refer to Figure 3-2)
5.2 WITHOUT THE BY-PASS LINE
Close inlet and outlet valves.
Introduce air to the dryer by opening the inlet valve
slightly, wait for the dryer to fully pressurize then fully open the
valve. Allow dryer to fully pressurise, then
gradually open the outlet valve.
Turn on the ON/OFF switch at the bottom of the dryer. The green
LED on the panel will illuminate and the dryer will start cycling in
10 seconds. The mini- PLC screen shows the operations at that
moment. The dryer is now on stream.
5.3 USING THE BY-PASS LINE
With the inlet and outlet valves closed and the by- pass valve open, introduce air to the
dryer by opening the inlet valve slightly, wait for the dryer to fully pressurize then fully
open the valve.
Allow the dryer to fully pressurise, then open the outlet valve while simultaneously clo-
sing the by-pass valve.
Turn on the ON/OFF switch at the bottom of the dryer.The green led on the panel will illuminate and the
dryer will start cycling in 10 seconds. The mini-PLC screen shows the operations at that moment. The
dryer is now on stream.