System information

VNX™ System Operations8 of 114 Release 7.0
Managing the VNX
The tasks to manage the VNX are:
"Power up the VNX" on page 9
"Power down the VNX" on page 26
"Shut down the VNX in an emergency" on page 44
"Power up after an emergency shutdown" on page 45
"Halt the Control Station" on page 46
"Restart the Control Station" on page 48
"Halt the Data Movers" on page 51
"Restart a Data Mover" on page 52
"Check the system status" on page 53
"Back up the VNX database" on page 55
"Verify the daemons" on page 58
"Discover SCSI devices" on page 59
"Save SCSI devices" on page 60
"Identify the software versions" on page 61
"Set the time zone of the VNX" on page 62
"Configure NTP service using the CLI" on page 64
"Set the date and time of the VNX" on page 66
"Audit the VNX" on page 67
"Configure IP aliasing" on page 69
"Configure SNMP" on page 71
"Change the ConnectHome settings" on page 72
"Set the country code on the MT5634ZBA modem" on page 75
"Manual instructions for setting the country code" on page 78
"Change the Control Station hostname" on page 82
"Install Control Station Linux security alerts" on page 85
"Avoid private LAN IP address conflicts" on page 86
"Change VNX for block SP management port IP addresses" on page 87
"Interpret log files" on page 88
"NAS or SAN environment rules" on page 94
"Collect problem information" on page 97
"Troubleshooting" on page 104