Owner`s manual

17
7) Have the spa deck installed by a knowledgeable contractor to
ensure proper support.
8). If the spa is placed on the ground, even for a short period of time,
it must be supported by stones that are at least 2 inches thick and
12 inches square. A solid foundation should be provided as soon
as possible.
INSPECTION
You will want to inspect your spa, prior to lling it up with water. Look
for and remove any debris in the spa tub and in the lter. Verify that
pump plugs are installed on each of the pumps and the pump unions
are tight.