Owner`s manual
17
7) Have the spa deck installed by a knowledgeable contractor to
ensure proper support.
8). If the spa is placed on the ground, even for a short period of time,
it must be supported by stones that are at least 2 inches thick and
12 inches square. A solid foundation should be provided as soon
as possible.
INSPECTION
You will want to inspect your spa, prior to lling it up with water. Look
for and remove any debris in the spa tub and in the lter. Verify that
pump plugs are installed on each of the pumps and the pump unions
are tight.