Owner`s manual
INSTALLATION INSTRUCTIONS
General Procedures
240V Systems
This section covers the installation of your spa. All electrical steps must be
performed by a licensed electrician. The spa must be connected to a proper
power supply and meet all National Electrical Code (N.E.C.) and local code
requirements. The connection must include the conductors necessary for
operation and bonding, as required by N.E.C.
1. Remove the spa from its shipping container and retain all safety,
operation, and warranty information.
2. Position the spa on a flat, level surface such as concrete, or a wood
deck which provides adequate drainage.
3. Position the spa at least 5 feet from all metal surfaces unless each
metal surface is permanently connected to a bonding wire, as
indicated in step 4.
4. The spa may be installed within 5 feet of metal surfaces as follows:
- Installation must be in accordance with Article 680-42 of the
National Electrical Code, ANSI/NFPA 70-1996.
- Each metal surface must be
permanently connected to a
bonding wire which is attached
to a pressure wire connector
provided for that purpose.
- The pressure wire connector
is located on the equipment
system control enclosure.
- The bonding wire must be at
least No. 8 AWG (8.4 mm
2
)
solid copper wire.
- The bonding wire must be
attached to the pressure wire
connector and all metal
equipment, metal enclosures
of electrical equipment, metal
water pipe, or conduit within
5 feet of the spa.
General Procedures
Located on the side
of the spa pack box
9
Installation Instructions