Application Guide

Installation Instructions Section 5876
Spec. No. 582140000 (Models 802
NLDB, 802NLEB and 802NL-B) Issue AT, April 26, 2013
Chapter 2. Placing the Bays and Installing Internal/External Busbars Page 2-57
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Figure 2-42
Power/Distribution Bay Load Return Lug Extension Busbar Assembly (P/N 514543)
Assembly Procedure Step 3B
STEP 3B
Install "Covers"
(List 2 and 12 Bays E/W List 30 or 31 PDSC).
(2*) 10-32 Lock Nut, P/N 104564
(2*) 10-32 x 3/4" Tap Screw, P/N 218706500
* Parts are from the P/N 514690 or 514691 Kit.
Quantities are per Kit, two Kits shown in Illustrations.
The following parts are not used: (2) 1/4-20 x 1/2" Bolt
(P/N 227640200), (2) 1/4" Lock Washer (P/N 215111100),
(2) 1/4" Flat Washer (P/N 214110100)
Rear Top
of Bay
Assembled
View