Unit installation

Use and Maintenance Manual Air-cooled water chillers and Heat Pumps R-PAE/R-PAH/EAH Rev. 1 del 03/09
In case the manufacturer lifting kit (option) is not employed, make sure that the lifting
equipment used, the cables and the belts are in compliance with the relevant local regulation.
The overall dimensions of the units, packaging included, are indicated in the packing list sent by e-mail in order to
organise the loading.
4.4 Arrangements and placing
The installation of the machine is under the responsibility of the installer who must supervise the execution operations.
The execution of a correct installation presupposes that a plan has been drawn up by an expert and that is
carried out by skilled and trained technicians.
In the following paragraphs there are some tips and information to keep in mind when planning and
executing the machine installation
.
The unit installation must comply with local existing laws.
Before placing the unit, the following points must be checked:
Ø Connections for electric and hydraulic circuits must be done;
Ø Enough room must be left around the unit to allow the routine and the special maintenance, such as
compressors and heat exchangers replacement. The dimensions of this free space is represented by the
dashed area as shown in Pictures from 24 to 31, for units with single and multi-scroll compressors and for units
with screw compressors.
Ø The floor where the machine is positioned can bear the total unit weight under normal operation.
Picture 24 Service Area for RAE / PAE 41 - 101
20