Measurement Guide

b-4 Drill the pilot hole and screw in the mounting screws.
Step 2
Step 3
Note
a-15 See a-7,a-8,a-9,a-10 on how to mount brackets.
b-9 Mark the placement of the screws, drill the pilot holes and screw in the mounting
screws see b-4,b-5,b-6.
b-11 Mark the placement of the screws, see b-4,b-5,b-6, then mount the track.
a-16 Next insert an outer track, if this is the last segment also insert the end cap.
(See a-3 and a-14.)
b-10 Next, Insert an outer track, if this is the last segment also insert the end cap.
(See a-3 and b-8)
a-14 After mounting the first segment, insert an inner track. Make sure there is at
least 3” overlap. Mark the placement of the next bracket and make sure rest
of brackets are evenly spread out.
2-4 Push the tab on the end cap up to unlock, remove the end cap, and insert the panel’s
rubber liner into the weight.
Remove Pinch the weight
4”
b-1 See a-1,a-2,a-3 but make the marks on the ceiling instead.
b-3 Mark the screw placements of your first outer track segment.
b-7 After mounting the first segment of the track, insert the sliders.(See a-11,a-12,a-13)
b-8 After inserting the sliders, insert an inner track. Make sure there is at least 3”
overlap. Mark the placements of the next screw and make sure they are evenly
spread out.
b-6 Mount the track through the keyholes, shift it into place, and lock it in place
by tightening the screws.
123456
Close the gate
a-17 Mark the place ment of the last brackets and any other brackets. Make sure
there is a 3” over lap. See a-7,a-8,a-9,a-10 on how to mount the brakets.
b-2 See Note 4 for required screw placements, spread out the placements of other
screws evenly.
Push Down
Measure the height of the installation
*Make sure the mark is parallel to the edge
Lock the slider
Outer trackInner track
Outer track
Outer track
Outer track
Outer track
Outer trackOuter track
Inner track
Outer trackInner track
Inner track
Inner track
Inner track
Inner track
Overlap
3”
Overlap
3”
a-13 Separate the sliders, align the last slider with the end of the curtain rod,and
lock the last slider by tightening the both screws on the slider.
Separate
Ceiling Installation (for wall installation, see step1.a)
For ceiling installations, finials cannot be used.
b-5 Loosen the screws.
Mount the rod onto the screws Shift the rod into place Tighten the screws
Panel Curtain Installation (panel curtain sold separately)
2-1 Remove and discard the caps from the panel curtains.
295cm
172cm 67
3
/4
116
1
/8
232cm
A
B
C
Centimeter Inches
Panel
116
1
/8” panels come with
*To assist with installation, do not unfurl the curtains
until they are inserted into the slider.
2-2 Push the panel retaining gates on the sliders up.
Push up
2-3 Insert the rubber liner part of panels curtain into the sliders in the order shown
below, close the retaining gate, then furl the curtains.
Open Close
2-5 Extend the baton, insert the baton in to baton cap and screw it into place.
Customizing the Panel Curtain
3-1 Measure the height of the installation. Measure and mark the panel curtain at the
desired height (a curtain weight can function as a straight edge).
3-2 After cutting panel curtains to size with scissors or a utility knife, remove the rubber
liners from the scraps. Staple the rubber liners onto panel curtains.Space the staple
2 inches apart and hammer the staples flat with a hammer.
Each rubber liner can be reused up the 3 times.
Step1.b
91
5
/16