Owner`s manual

26591-1-1209Page 26
           

together. First, apply a generous bead of silicone sealant to


-
cure this connection with a 4” diameter band clamp provided.

clamp.
 
vent to hard pipe connection. Use silicone sealant at this joint
also, overlap at least 1-1/4”, then secure the joint with the 7”
diameter band clamp provided. Be careful not to damage or

 
components as shown in Figure 31 and pre-install the roof
jack assembly to the hard pipe approximately 18” from the
top end of the hard pipe.
13. Now the pre-assembled vent system may be carried to the
roof, then lowered through the roof cutout opening (see step


14. Secure the roof support assembly to the roof sheathing with
at least (4) nails/screws through each support bracket. Check
that the combustible clearances through the roof framing will
maintain at least a 1” clearance from the vent pipe.
15. Determine how high the vent terminal should be located
above the roof line based on the roof pitch information shown
in Figure 32. Adjust the vent system height by loosening the
pre-installed roof support pipe clamp and sliding the vent
pipe up or down as pre-determined, then re-tighten the pipe
clamp. Install a couple of sheet metal screws through the pipe
clamp into the outer hard vent pipe to lock in place.
     


WING NUT (2)
PIPE CLAMP
ROOF BRACKET (2)
NUT (2)
SCREW (2)
H
X
12
ROOF PITCH IS X/12
H (Min.)-Minimum height from
roof to lowest discharge opening
DISCHARGE
LOWEST
OPENING
VENT CAP
GAS VENT
Figure 31
Figure 32
ROOF PITCH H (Min.)
Flat to 6/12 12” (305mm)
6/12 to 7/12 15” (381mm)
Over 7/12 to 8/12 18” (457mm)
Over 8/12 to 16/12 24” (610mm)
Over 16/12 to 21/12 36” (914mm)
DVVK-4FV DIRECT VENT TERMINATION KIT (continued)