Owner`s manual

26591-1-1209Page 36
Installing Support Brackets (Figure 47)
A horizontal pipe support MUST BE used for each 3 feet of horizontal
run. The pipe supports should be placed around the pipe and nailed
in place to framing members. There MUST BE a 3 inch clearance
to combustibles above 6 5/8 inch diameter pipe and elbows and
1 inch clearance on both sides and bottom of 6 5/8 inch pipe to
combustibles on all horizontal pipe sections and elbows.
Vertical runs of this vent systems must be supported every 4 feet

5/8 inch vent pipe and secured with nails or screws to structural
framing members.
Figure 47
Installing Firestops (Figures 48, 49, 50, and 51)
Firestops are required for safety whenever the vent system passes


clearances are maintained to the vent system.
Horizontal runs in the vent system which pass through either interior

the wall through which the vent passes.

previously cut. Secure with nails or screws. The heat shields of the

See Figure 48.
10”
11”
Figure 48
Vertical runs of this system which pass through ceilings require the

which the vent passes.
Position a plumb bob directly over the center of the vertical vent
component and mark the ceiling to establish the center point of the
vent. Drill a hole or drive a nail through this center point and check

runs. Reposition the appliance and vent system, if necessary, to
accommodate ceiling joists and/or obstructions.
Cut a 10 inch x 10 inch hole through the ceiling, using the center
point previously marked. Frame the hole with framing lumber
the same size as the ceiling joists. See Figure 49. If the area
above the ceiling is NOT an attic, position and secure the ceiling

See Figure 50. If the area above the ceiling is an attic, position
See
Figure 51.
NOTE: Remove insulation from the framed area in the attic before

PIPE STRAP
STUD WALL
1” MIN.
(25.4mm)
FLUE OUTLET
48”
(1219mm)
FRAMING AND FINISHING