Owner`s manual

26591-1-1209 Page 59
        
Note: On peninsula models, the blower must be installed at
the end which has the brick panel installed. Position blower
assembly so that you align the notch on back of blower as-
sembly with the center screw on side/end panel, then push the
       
          -
place. The magnets on the back and bottom of blower as-
See
Figure 71.
5. Once the blower assembly is in position, remove the upper
louver as shown and locate the switch tab (end of support


secure the fan control switch to the tab. See Figure 72. Once
the fan control has been secured, bend the tab forward so that
the face of the fan control is pushed down so it contacts the

 

-
bly. See Figure 71. Attach the two 3/16" wire terminals to
the fan control switch as shown in Figure 72. Attach the
wire terminals at the blower as shown by letters "A" and
"B" in Figure 75 on page 60.
7. Route the wires away from moving parts of the blower as-
sembly and retain wires together near the blower motor using
the plastic purse clip provided.
8. To complete the installation, plug the power cord into the
junction box receptacle previously installed in the bottom of
See Figures 70 and 71.
9. Once all connections are made electrically, it is recommend-
ed that you test the blower fan control operation by turning

on and let run until blower is activated. This should take ap-
proximately 10 to 20 minutes from a cold start. Once blower
is activated, check for proper operation. Do not place hands
near blower assembly or other wiring while power is on.
10. Replace louver(s).
11. This completes the installation of the optional FBB5 Blower
kit accessory.
Note: This blower is equipped with a heat activated fan control

        
down. The time will vary for the activation of the fan con-

type, BTU input variables, and log set style. Generally, it
may take from 10 to 20 minutes to activate blower/fan con-
trol from a cold start.
Figure 71
Figure 73
USE OF ASTANDARD
ON/OFF WALL SWITCH TO
OPERATE OPTIONAL BLOWER
Figure 72
FA N CONTROL
SWITCH
OPTIONAL BLOWER INSTALLATION INSTRUCTIONS (continued)
FA N
CONTROL
SWITCH
WIRE ASSEMBLY
FROMFAN
CONTROLSWITCH