Owner`s manual

31449-4-1113 Page 13
INSTALLATION
Framing and Finishing
1. Choose unit location.
2. Frame in replace with a header across the top. It is important
to allow for nished face when setting the depth of the frame.
See Figure 10B.
3. Attach replace to frame using nailing ange. Preset depth to
suit facing material (adjustable to 1/2", 5/8" or 3/4" depths).
NOTICE: Fireplace must mount ush to facing material. If fac-
ing material requires more depth than 3/4" mark and drill two 1/8"
holes into replace side at appropriate depth. See Figure 10A.
4. Use eight 1/2" hex-head screws supplied in hardware package,
to screw through slotted holes in nailing ange and then screw
into pre-drilled holes on replace side. Measure from face of
replace to face of nailing ange to determine nal depth.
Vent Pipe Clearance
NOTICE: Maintain one inch of clearance around top vent pipe.
See Figure 11. For rear vent, maintain a minimum 1" clearance
to the bottom and sides of the vent, and three inch clearance to
combustibles above the vent pipe. See Figure 12.
Figure 10A
Figure 10B
Figure 11 - Top Vent
Figure 12 - Rear Vent