INSTALLATION
Framing and Finishing
1. Choose unit location.
2. Frame in replace with a header across the top. It is important
to allow for nished face when setting the depth of the frame.
See Figure 10B.
3. Attach replace to frame using nailing ange. Preset depth to
suit facing material (adjustable to 1/2", 5/8" or 3/4" depths).
NOTICE: Fireplace must mount ush to facing material. If fac-
ing material requires more depth than 3/4" mark and drill two 1/8"
holes into replace side at appropriate depth. See Figure 10A.
4. Use eight 1/2" hex-head screws supplied in hardware package,
to screw through slotted holes in nailing ange and then screw
into pre-drilled holes on replace side. Measure from face of
replace to face of nailing ange to determine nal depth.
Vent Pipe Clearance
NOTICE: Maintain one inch of clearance around top vent pipe.
See Figure 11. For rear vent, maintain a minimum 1" clearance
to the bottom and sides of the vent, and three inch clearance to
combustibles above the vent pipe. See Figure 12.