Owner`s manual

30329-0-0312 Page 11
Framing and Finishing
1. Choose unit location.
2. Frame in replace with a header across the top. It is important
to allow for nished face when setting the depth of the frame.
3. Attach replace to frame using adjustable frame. Preset depth
to suit facing material (adjustable to 1/2", 5/8" or 3/4" depths).
4. Use (8) 1/2" hex-head screws supplied in hardware package,
to screw through slotted holes in drywall strip and then screw
into pre-drilled holes on replace side. Measure from face of
replace to face of drywall strip to determine nal depth.
Figure 9
Vent Pipe Clearance
Note: Maintain one inch (1") of clearance around vertical vent
pipe. See Figure 10. For horizontal vent, maintain a minimum 1"
clearance to the bottom and sides of the vent, and 3" clearance to
combustibles above the vent pipe. See Figure 11.
Figure 10
VENT PIPE
1" MINIMUM CLEARANCE AROUND VENT PIPE
USE OUTER
(4) FLANGES
FOR 1/2”
DRYWALL
Figure 11
INSTALLATION