Owner`s manual

30329-0-0312Page 38
Continue replacing components per the vent system conguration.
Be certain that each succeeding vent component is securely tted
and locked into the preceding component in the vent system.
ReassemblyandResealingGasAccumulationReliefSystem
GlassFrameAssemblyandCombustionChamber
Whenever the glass frame assembly is pivoted open by a delayed
ignition in the main burner, the glass frame assembly gaskets and
combustion chamber must be examined by a qualied service person
for damage. All damaged gaskets on the glass frame assembly and
combustion chamber must be replaced by a qualied service person.
If damage occurs to the combustion chamber, it must be replaced
by a qualied service person. Contact Empire Comfort Systems,
Inc. for replacement parts.
VerticalThroughtheRoofApplications(Figure62)
Your Gas Fireplace has been approved for:
a) Vertical installations up to 40 feet in height.
b) Two sets of 45 degree elbow offsets within these vertical
installations. From 0 to a maximum of 8 ft. a vent pipe can be
used between elbows.
c) Wall straps must be used to support offset pipe every 4'.
This application will require that you rst determine the roof pitch
and use the appropriate venting components.
TYPICAL ROOF
SUPPORT
TYPICAL JOIST
SUPPORT
40’
(12.19M)
MAXIMUM
8’ (2.44M)
MAXIMUM
8’ (2.44M)
MAXIMUM
45°
45°
Figure 62
Installing the Vent System in a Chase
A chase is a vertical box-like structure built to enclose the gas
appliance and/or it’s vent system. Vertical vent runs on the outside
of a building may be, but are not required to be installed inside a
chase.
FEMALE
LOCKING
LUG
MALE
LOCKING
LUG
Figure 61
CAUTION: Treatment of restop spacers and construction of
the chase may vary with the type of building. These instructions
are not substitutes for the requirements of local building codes.
Therefore, your local building codes must be checked to determine
the requirements for these steps.
NOTE: When installing this vent system in a chase, it is always good
building practice to insulate the chase as you would the outside
walls of your home. This is especially important for cold climate
installations. Upon completion of building your chase framing,
install the vent system by following the instructions in this manual.
Remember to build the chase large enough so that minimum
clearance of combustible materials (including insulation) to the vent
system are maintained.
ReassemblyandResealingVentPipeSystem
Attach vent pipe to inlet and outlet vent adaptor on replace, replace
horizontal and vertical pipe lengths, elbows and horizontal or vertical
termination kit.
All vent system components lock into place by sliding the concentric
pipe section with four (4) equally spaced interior beads onto the
appliance collar or previously installed component end with four
(4) equally spaced indented sections. When the internal beads of
each starting outer pipe line up, rotate pipe section clockwise 90°
(approximately 3 inches). The vent pipe is now locked together.
VERTICALTERMINATION(continued)