Specifications
EMPYRE PRO SERIES INSTALLATION AND OPERATION MANUAL  9
INSTALLATION
Identifying Main Components 
(see drawings on page 8)
Nº Description
1 Light
2 Smoke Curtain
3 Light & Blower Switch
4 Aquastat
5 Control Panel Door
6 Loading Door
7 Ash Clean Out Door
8 Secondary Burn Chamber
9 Automatic Smoke Exit Lid
10 Vent Cap & Water Level Indicator
11 Top Lifting Hook
12 Flue Area
13 Bafe
14 Flue/Fly Ash Clean Out Cover
15 Return Ports*
16 Door Latch/Locking Bolt
17 Rear Access Door
18 Supply Ports/Low Water Cut Off - Shared Port*
19 Fork Lift Lifting Guides
20 Ash Rake
21 Wire Brush Flue Cleaning Rod
22 Drain
23 Snap Disc
24 Probe
25 Junction/Receptacle Box
26 Heat Exchange Flues
27
BafeStops
28 Blower
29 Flapper Unit
30 Empyre System Optimizer
*On the Pro Series 200 all supply and return ports 
are 1”. On the Pro Series 400 the supply and re-
turn ports are: one set at 1” and one set at 1 ¼”.
Minimum Clearance to Combustibles
Side Wall to Furnace 12” (305 mm)
Back Wall to Furnace 36” (914 mm)
Front of Furnace to Combustibles 48” (1220 mm)
Combustibles to Flue 12” (305 mm)
Ceiling to Furnace 33” (838 mm)
Suggested Material Required to Complete 
an Installation
The following list includes examples only of the types of 
material needed for a typical installation. We recommend 
that a professional plumbing and heating contractor be 
engaged to ensure proper installation.
a. Furnace
b. 
Concrete pad or concrete patio blocks for furnace base
c.  Supply and return line
d.  Underground line insulation
e. Radiant or forced air furnace heat exchanger 
(radiator or coil)
f.  Domestic hot water tank heat exchanger (optional)
g.  Circulating pump
h. Pipettings
i.  Ball valves
j.  Approved rust inhibitor
k.  Installation manual
l. Thermostat
m.  Plumbing/electrical in order to prevent the furnace 
from operating under 165°F (74°C). See page 12.
Optional: Low water cutoff switch kit. Ask your dealer for 
details.
Installation Requirements
1.  The Empyre Pro Series furnace must be installed on 
alevel,noncombustibleoorpad,suchasconcrete
or patio blocks.
2. Install the furnace in a location that best suits 
wind direction for your home and building(s) and 
neighbouring residents.
3.  Installation of the Empyre Pro Series furnace must be 
completed in accordance with local, state, provincial 
andfederalbuildingandrecodes.
IMPORTANT: 
Contact an insurance provider prior to 
installation to ensure that installation is in compliance with 
local insurance requirements and all terms have been met.










