Specifications

18 EMPYRE PRO SERIES INSTALLATION AND OPERATION MANUAL
OPERATION
Larger diameter and irregular shaped logs are more
likely to cause wood to hang up or ‘bridge.’ Place the
larger logs on top.
3. Loadwoodintotherebox.
Ideal Log Size of Seasoned Wood
Diameter Length
+/- 2”(5 cm)
in cm in cm
Pro Series 200 6 15 26 66
Pro Series 400 7 18 34 86
Centrewoodintherebox.Thereshouldbeagapof
several inches between the wood and both the front
andbackoftherebox.Placingwoodupagainstthe
backofthereboxcanresultinunburnedwoodwhich
can cause logs to hang up.
4. Forthe mostefcientburnalwayskeepthe brick
hotbymaintainingwoodintherebox.
5. Do not cover the brick slots when placing wood into
therebox.
Daily Routine
Morning Loading:
Load wood into the unit as described above.
Late Afternoon Check:
Checktheunittoensurethereissufcientwoodtoburn
until the end of the day. Load just enough fuel to ensure
abedofburningcharcoalisinthereboxprior tothe
night loading.
Note: The rebox is hottestwhen the woodhas burnt
down to a bed of charcoal. When the primary chamber
has burnt down to this level, the rebox will dry out
and burn most of the accumulated creosote on the
walls. If the primary chamber is full all of the time, the
temperatureinthereboxstaysquitecoolandcreosote
may build up on the walls.
Night Loading:
Rakethecoalandashfromtheperimeteroftherebox
and especially from the back wall of the chamber where
ash tends to build up. With the ask rake, pull the ash
and charcoal away from the walls. The force of the fan
will blow the ash into the lower chamber on its own. If
this is done every day the ash should fall through the
slots easily.
Load wood into the unit as described above.
Cleaning Out Ash
Firebox and Secondary Burn Chamber
To clean ash outof the rebox,gently rakeit into the
secondary burn chamber through the openings in the
bottomoftherebox.
Ash in the secondary burn chamber should be cleaned
out weekly or as necessary, depending on fuel quality and
burn rate.
1. Dothiswhentherehasdieddownbeforereloading
furnace. Switch blower off.
2. Open ash clean out door.
3. Reach the ash rake to the back of the chamber and
pull ash forward into a steel container. Do not scrape
all of the ash out. It is recommended to leave 1-2”
(2.5-5.1cm)ofashcoveringtheooroftherebox.
4. Firmly close and latch ash clean out door.
5. Switch blower on.
Flues and Chimney
Check for y ash buildup in the ue area weekly.
1. Tocleanyashoutofueareaandchimney,switch
bloweroff,openrearaccessdoorandremoveue/
yashcleanoutcover.
2. Empty ash clean out tray into a steel container.
Sweepyashintoverticalues.
3. Sweeporvacuumouttheueareas.
4. To achieve the highest efciency in your furnace,
cleanallhorizontalandverticaluesregularlywith
ue cleaning tools. (see pg 8, item 21 Wire Brush
Flue Cleaning Rod.)
NOTE: Remove bafe (see pg 8, item 13) to gain
access to all ues. Caution: bafe may be hot.
Reinstall bafe after cleaning.
Pro Series 400: Removebafebyrstpullingforward
then slide to the right and up. When reinstalling,
bafemust beseatedoninside of sidestops(see
page 8, items 13 and 27).
Correct:
The rebox should be
loaded with wood of
proper length. This will
lengthen the burn time.
Incorrect:
The rebox loosely lled
with irregular pieces of
wood will decrease burn
time and may cause un-
necessary bridging.