SYSTEM DESCRIPTION AND INSTALLATION MANUAL
JetWave™ System
© Honeywell International Inc. Do not copy without express permission of Honeywell.
INSTALLATION
1. Overview
A. JetWave™ System Components
The JetWave™ system includes five LRUs:
•Modman
•APM
KANDU
•KRFU
OAE - either a TMA or FMA.
NOTE:
OAE equipment must be installed within an approved radome.
B. Installation Procedure Overview for the JetWave™ System
The overview of the installation procedure for the JetWave™ system is as follows:
(1) Install adapter plate for the FMA. The adapter plates required for mounting the FMA are
av
ailable in installation k
its from various suppliers.
(2) The TMA is installed on the top ribs of the tail of the aircraft. In some cases an install bracket
can be use
d.
(3) Install the OAE and JetWave™ components in accordance with the insta
llation drawings.
(4) Install wiring in accordance with the interconnection d
iagram. The cables and adapters are
available as installation kits from various suppliers.
(5) Do wiring and RF cable checks to make sure they are installed correctly and meet the
installation requirements.
(6) A
pply power to the system.
(7) D
o the post-installation checks.
(8) Test the system on the ground if local regulations permit.
2. Certification and Approvals
All antenna installations must be inspected and approved by an FAA authorized Designated Engineering
Representative and must be documented on FAA form 8110-3.
3. On-ground Testing and Commissioning
NOTE: There are restrictions to testing the JetWave™ system for the commissioning process.
NOTE:
Each country has its own restrictions to on-ground testing and transmission. Verify regulations
before testing the system. Particular attention must be observed the first time the system is turned
on and able to transmit. At this point the system will download a map detailing the areas where
transmission is and is not allowed. This map will take effect on the next power-up.