User's Manual

EMS Wireless Operator’s Manual
EkoLink II
2
1.0 Installation Guide
The following guidelines provide a step by step installation procedure which should
be followed closely to insure a successful deployment.
1.1 Shipment Contents
The following items should be included with each EkoLink II Shipment:
Hub(s)
Remotes(s)
User manual (this document)
Software Command Reference Manual
AC Power supply (optional)
1.2 Site Selection
1.2.1 Hubs
The Hub(s) should be located as close as possible to the donor BTS. Observe all
environmental specifications for the hub to avoid damage from moisture, heat, cold,
etc.
1.2.2 Remotes
Ensure that each remote location is as close as possible to the dedicated
antenna(s) it serves. Observe all environmental specifications for the remote to
avoid damage from moisture, heat, cold, etc.
1.3 Pre-installation
Prior to installation, a carefully planned system layout should be documented. At a
minimum, this document should include the location of the Hub, the location of the
Remotes, the Antenna locations, the fiber locations and lengths, and the location of
the power supplies for both Hubs and Remotes.
The Hub is located at the Building Base Station or BTS. The Hub interfaces with
the user's PCS System. The Remote units are distributed in the building and
interface to the user’s antennas. Optical fiber cables connect the Hub to the
Remote units. The Hub is typically powered by an AC power supply. The AC
power supply will power up to eight Remotes.