User's Manual

EMS Wireless Operator’s Manual
EkoLink Plus Fiber Optic DAS
19
2.0 Equipment Mounting and Installation
The following general recommendations should be adhered to for optimal performance.
1. The remote units should be mounted so the heatsink avoids direct sunlight. This
will extend the life of these units.
2. The remote units must be mounted upright so that the connectors are on the
underside. This will help prevent a buildup of moisture inside the cabinet.
3. The hub and remotes are equipped with N-type antenna connectors. Connectors
are located on the bottom of the remote cabinet.
4. Ensure that adequate room has been allocated for the bending radius of the
cables. Refer to the cable manufacturer’s specifications for the allowable cable-bend
radius.
5. Ensure that adequate room is allowed for the opening and closing of the
remote unit door. See the specification table for dimensions of the cabinet.
2.1 Hub Mounting
The hub should be mounted as close as possible to the donor BTS. The 19” (48.3 cm)
rack mount version is shown in Figure 4. The alternate NEMA 4 weatherproof wall
mounted enclosure is shown in Figure 5. Observe all environmental specifications for
the hub to avoid damage from moisture, heat, cold, etc.