Best Practices - Installation
PREP:
Pattern Installations
Before selecting a multi-size, multi-finish, or multi-product paern, it is important to understand the nuances of paern assembly and installation. Having the distribution center dry lay
prior to ordering is absolutely necessary to ensure a paern will work. Grout joint width must be taken into consideration in order for the final paern design to align properly. Proper
overages should be ordered to ensure the entire project is being ordered from appropriate size and shade calibers. When doing a checkerboard paern for example with two tiles that
are the same nominal size, from the same series, may not work if the actual dimensions of the product are not the same. Each color, finish and size may be from a different production
run. Selecting tiles from the same series or even the same color does not guarantee that a paern will work correctly.
Dry Lay Prior to Setting in Mortar
It is standard practice to dry lay all tiles with a paern as well as mosaic products, especially those with an interlock prior to seing them in mortar. This is especially critical with natural
stones that may display V2 Shade variation or higher. Dry laying ensures the interlock is tight, the tiles can be blended properly and the sheet placement and cuts can be planned
accordingly.
Gauged Porcelain
It is important to understand gauged porcelain standards for interior installations (ANSI A108.19) prior to beginning any work. Special tools and procedures must be observed to ensure a
successful install. There are many things to consider from transportation of A-frames on flat-bed trucks, A-frames to move materials around the jobsite, carrying material up elevators and
stair wells, suction cups and special tools for handling, additional surface prep to ensure floor flatness, appropriate tables and tools for cuing, corner protectors, additional labor and the
like. Emser Tile, in partnership with its adhesive manufacturers, offers training and information on how to achieve a successful installation in this product category prior to purchasing. As
of the publication of this catalog there are no industry standards for exterior use. As such, manufacturer’s recommendations prevail. A mortar method can be used for horizontal exterior
applications, while a mortar and mortar/fastener method should be considered for vertical exterior applications.
SET:
Finishing High Relief Edges
3D, textured, split-face and high relief products may be challenging to trim out when coming to a sudden stop in the middle of a wall, when tiling around an outlet, mitering a corner, or
buing them up to an adjacent wall covering. Due to the nature of these products, it is best to tile from end to end both vertically and horizontally whenever possible. Where a stop
is necessary, some series may come with a flat field tile that can be used to trim out the desired edges. Otherwise, it may be necessary to simply leave the edge grouted, coordinate
bullnose and flat pieces from other series, or install metal profiles. In the case of natural stone split faced edges, hand chiseling may be required. Additional options should be discussed
and may be available prior to material specification.
Knocking Down Ridges
Before pressing glass tiles and mosaics into adhesive, it is important to knock down the ridges and smooth them out with the flat edge of your trowel, to prevent them from showing
through the glass lens, or coming up through thinner mosaic products. In some cases, where back buering tiles is necessary, it is important these ridges be knocked down as well as not
to create stripes or unintentional voids. For glass lens products, any mortar or adhesive that comes up between the tiles may be visible post install.
Leveling Clip System
A leveling clip system is recommended to achieve narrow grout widths and minimize lippage with planks and large format tiles (those with a single edge being >18”). The clip system will
not only allow for a tighter joint, but will minimize the visibility of any inherent warping, or lippage, that may be prevalent in the finished application. Oen times a clip system will allow
a joint to be narrower than the manufacturer’s recommendation and should be discussed with a sales associate prior to specification.