Installation & Assembly
www.encloscreens.com
7
ASSEMBLY INSTRUCTIONS ZP19047
Ensuring the routed
holes are facing
down, slide the other
horizontal rail over
the top of the posts.
routed holes in the top
holes in the top rail and
posts align. Drive (4)
¾” self-drilling stainless
steel screws into the
pre-drilled holes.
Ensuring the routed holes are
facing up, slide one rail over the
in the rail and posts align.
Note:
align holes.
B
H
1. Slide the Post Anchors (B)
post. 16" of post anchor should be visible.
2. (K) to drill (4) total holes in
the post anchor through the pre-drilled holes in the
3. (H)
into the pre-drilled holes in the horizontal rail.
K
STEP 4.2 STEP 4.3
STEP 4.4