Operating Instructions
Table Of Contents
- Table of contents
- 1 Document information
- 2 Basic safety instructions
- 3 Product description
- 4 Incoming acceptance and product identification
- 5 Mounting
- 5.1 General instructions
- 5.2 Mounting requirements
- 5.3 Mounting the measuring device
- 5.3.1 Encapsulated antenna, PVDF40 mm (1.5 in)
- 5.3.2 Drip-off antenna PTFE 50 mm (2 in)
- 5.3.3 Integrated antenna, PEEK 20 mm (0.75 in)
- 5.3.4 Integrated antenna, PEEK 40 mm (1.5 in)
- 5.3.5 Turning the housing
- 5.3.6 Turning the display module
- 5.3.7 Changing the installation position of the display module
- 5.3.8 Closing the housing covers
- 5.4 Post-mounting check
- 6 Electrical connection
- 7 Operation options
- 8 System integration
- 9 Commissioning
- 10 Operation
- 11 Diagnostics and troubleshooting
- 11.1 General troubleshooting
- 11.2 Error - SmartBlue operation
- 11.3 Diagnostic information on local display
- 11.4 Diagnostic event in the operating tool
- 11.5 Adapting the diagnostic information
- 11.6 Queued diagnostic messages
- 11.7 Diagnostic list
- 11.8 List of diagnostic events
- 11.9 Event logbook
- 11.10 Resetting the device
- 11.11 Device information
- 11.12 Firmware history
- 12 Maintenance
- 13 Repair
- 14 Accessories
- 14.1 Weather protection cover 316L
- 14.2 Plastic weather protection cover
- 14.3 Mounting bracket, adjustable
- 14.4 M12 socket
- 14.5 Remote display FHX50B
- 14.6 Gas-tight feedthrough
- 14.7 Commubox FXA195 HART
- 14.8 HART Loop Converter HMX50
- 14.9 FieldPort SWA50
- 14.10 Wireless HART adapter SWA70
- 14.11 Fieldgate FXA42
- 14.12 Field Xpert SMT70
- 14.13 DeviceCare SFE100
- 14.14 FieldCare SFE500
- 14.15 Memograph M
- 14.16 RN42
- 15 Technical data
- Index
Micropilot FMR60B HART Commissioning
Endress+Hauser 35
9 Commissioning
All configuration tools provide a commissioning assistant that supports the user when
setting the most important configuration parameters (Guidance menu
Commissioning wizard).
9.1 Preliminaries
The measuring range and the unit in which the measured value is transmitted correspond
to the data on the nameplate.
L
WARNING
The settings of the current output are relevant for safety!
This can result in product overflow.
‣
The setting for the current output depends on the setting in the Assign PV parameter.
‣
After changing the setting of the current output, check the setting of the span (Lower
range value output and Upper range value output) and change it if necessary!
9.2 Function check
Before commissioning the measuring point, check whether the post-mounting and post-
connection checks (checklist) have been performed:
•
A
"Post-mounting check" section
•
A
"Post-connection check" section
9.3 Establishing a connection via FieldCare and
DeviceCare
9.3.1 Via HART protocol
1 4 5
7
6 82
3
9
A0044334
9 Options for remote operation via HART protocol
1 PLC (programmable logic controller)
2 Transmitter power supply unit, e.g., RN42
3
Connection for Commubox FXA195 and AMS Trex
TM
device communicator
4
AMS Trex
TM
device communicator
5 Computer with operating tool (e.g., DeviceCare/FieldCare, AMS Device View, SIMATIC PDM)
6 Commubox FXA195 (USB)
7 Field Xpert SMT70
8 Bluetooth modem with connecting cable (e.g., VIATOR)
9 Transmitter