Installation Guide

Page 8
WALK-IN TUB MANUAL
5701 NW 35 Avenue Miami, FL 33142 • Phone 866-633-4882 • Fax 866-560-1060
INSTALLATION PREPARATION
INSTALLATION PREPARATION
A BAD LEVEL WILL MAKE YOUR TUB LEAK!
1. CHECK FLOOR LEVEL
2. ADJUST LEVELING FEET AS NEEDED
Clear the floor of any debris or trash and use a 5-6 foot level to determine if the floor is level. If the
floor is not level, it is imperative that the bathtub’s leveling feet are used to ensure the tub itself is
perfectly level.
Note: it is important that all leveling feet are completely touching the oor and level for the door
system to work properly.
1. Check to ensure that the drain piping has been “roughed-in” at the proper location.
2. Ensure that the proper electrical service has been installed at the pump location. See electrical requirements in the manual (on
following page).
Adjust leveling feet as needed making sure all feet are completely
touching the oor. The tub must be completely level to avoid leakage.