User Manual

2
INSTALLATION OPTIONS
CEILING
SUSPENDED
A
Allows minimum duct elevation changes, least elbows, and straightest
duct runs.
Threaded rod suspension.
Ducting to floor level for lint collection with Energenics flexible connector
to 55 gallon drum.
Controls mounted on wall or beam at shoulder height.
48 inch roof penetration and duct, gooseneck duct on the roof or Optional
Energenics’ supplied side discharge.
Energenics side discharge available for inside mounting and exhausting
out the side wall.
FLOOR MOUNTED
ON TOWER
B
Allows minimum duct elevation changes, least elbows, straightest duct
runs.
Optional Energenics supplied 4 inch tubular tower can be adjusted for
height to match ceiling restrictions.
All controls should mounted on the tower at shoulder.
48 inch roof penetration and exhaust duct.
FLOOR MOUNTED
C
Requires significant duct elevation changes, thus increasing ducting
backpressure.
Must be ordered with optional (no cost) legs.
Can order Pre Plumb option with control mounted on the filter by
Energenics.
Mounts over 55 gallon drum with Energenics flexible connector.
Gooseneck duct on the roof or Energenics optional side discharge.
Energenics side discharge option also available for inside mount and side
wall discharge.
Gooseneck duct on the roof or Energenics supplied options side
discharge.