EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP USER MANUAL HANDBUCH HANDLEIDING MANUEL DESCRIPTIF РУКОВОДСТВО ПОЛЬЗОВАТЕЛЯ КЕРІВНИЦТВО КОРИСТУВАЧА
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP PROGRAMMABLE POWER STRIP PROGRAMMIERBARE USB STECKDOSENLEISTE PROGRAMMEERBARE STEKKERDOOS STRIP DE PUISSANCE PROGRAMMABLE ПРОГРАММИРУЕМЫЙ ФИЛЬТР ПИТАНИЯ ПРОГРАМОВАНИЙ ФІЛЬТР ЖИВЛЕННЯ Do not plug several sockets in line Do not use if covered De-energized only if power plug is unplugged NEVER connect appliances which does not allow unattained operation ! 2 All brands and logos are registered trademarks of their respective owners
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP 1. Introduction Congratulations with your purchase of this Energenie Power Manager. Your EG-PMSU is an advanced surge protector with power management features. Four sockets are individually manageable by the computer via USB interface. The sockets can be switched on/off by a timer schedule, by user or different events. It is also possible to pre-program the unit event timer schedule (hardware schedule) and then disconnect EG-PMSU from the managing computer.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP The manageable sockets can then be switched on and off by the schedule, simple typical applications could be: “switch my peripherals on every working day at 8:50 AM” etc.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP Working temperature range: from +10 to +40 degrees Celsius Dimensions: 420 x 60 x 52 mm Net weight: 0.7 kg 1.3. Hardware requirements Computer running Windows® 2000/XP/Vista/7/8 is required for using the Power Manager software One free USB port 1.4.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP 2.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP 2.1. Indicators Main rocker switch Z with built in self recovering fuse (see Figure #1 above) is lit – this means that EG-PMSU is connected to the power supply and active. The indicator Socket 1 (2,3,4) (see Figure #1 above) is lit – this means that this particular socket is switched on. 3. Installation It is strongly recommended to avoid damp or wet places for installation. EG-PMSU should be connected to the appropriate AC wall outlet.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP 3.1. Getting started Connect EG-PMSU to the wall outlet first and then to the USB socket of the manageable computer. EG-PMSU can now be switched on and off by means of the Main rocker switch (Z). The last socket of EG-PMSU is switched on and off by means of the Main rocker switch (Z) and cannot be managed by the computer – so it’s called non-manageable socket in this manual.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP NOTE: If the total power consumption (or peak power) of the devices, connected to EG-PMSU exceeds 1800 Watts, the circuit breaker may power EG-PMSU off. In this case, please, remove the excessive load first and then (after 2-3 minutes) press the main rocker switch (Z) to restore the power supply. 3.2. Power Manager installation Insert the Power Manager CD into a PC CD-ROM drive.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP 4.1. Managing EG-PMSU Double click on the socket icon in the system tray or select Open from the popup menu, you will get the windows with device list (see Figure #2 below).
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP Figure #3 Double click on the device and you will get the window of the main control panel shown on the Figure #4 below.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP Figure #4 Double click on each socket will switch it on or off (green color means the socket is switched on; red color means the socket is switched 12 All brands and logos are registered trademarks of their respective owners
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP off). Click the Settings button for each socket to access the Settings dialog box (see Figure #5 below). Figure #5 You can choose a different device and another socket from the Device and Socket drop down list-boxes.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP It is possible to give a name to the device and socket (for example Printer or Scanner) using the Rename button Check the System tray checkbox if you want to put the icon of the socket into the system tray. You can choose the icon from drop down list box. Such icon is a fast way to switch the device connected to the socket on/off or check the device status You can also assign a hot key to switch the socket on/off.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP 4.2. Setting up the hardware schedule Using the Hardware schedule button available from the Settings window you can create the hardware timer schedule (see Figure #6 below). To add a new record, click the Add button.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP The window Add entry will appear (see Figure #7 below). In the dialog box, specify the required time and the action Figure #7 To edit the record, select it and click the Edit button or just double click on the entry.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP Figure #8 To remove the record, select it and click the Remove button (see Figure #6 above). You can select multiple entries using Ctrl and Shift keys.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP Figure #9 After the schedule record has been created, click the Apply button (see Figure #6 above) to save the hardware timer schedule changes. In case of incorrect entries, these will be highlighted and an error message will appear. Click the Apply button again after correcting all the errors Use Sync button (see Figure #6 above) to synchronize device timer with PC clock.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP The new event time should be in the future There can not be a duplicate entry The total quantity of events can not exceed 16 per socket The total quantity of events also depends on the total execution period of the schedule The interval between the present and the last entry can not exceed 180 days Without loop the total execution period of the schedule can not exceed 215 days Loop period can not exceed 180 days NOTE: If the device is powered off t
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP 4.3. Setting up the software schedule Using the Software schedule button available from the Settings window you can create the software timer schedule (see Figure #10 below). NOTE: the software timer schedule will only be executed if the managing computer is on and the Power Manager is launched.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP To add a new task, click the Add button. The Add task window will appear (see Figure #11 below) Figure #11 In the Add task window, check Switch ON time and/or Switch OFF time checkboxes and specify the time to switch the socked on and/or off. If you want the same event to be performed periodically, check Perform task every checkbox and specify the time interval. You can also add remarks about the task in the Comment field.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP uncheck the Enabled checkbox and to enable the task again, re-check the checkbox. To edit the task, select it (see Figure #10 above) and click the Edit button or just double click on the task.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP To remove the task select it and click the Remove button (see Figure #9 above). You may select multiple tasks using Ctrl and Shift keys. You can also remove all tasks by clicking the Clear button HINT: Use the popup menu which can be activated by the right mouse button click over the table (see Figure #10 above). 4.4.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP Figure #13 To add a new program event, click the Add app button.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP Figure #14 Specify the application title and path to it using the Browse (…) button or typing it manually in the Title and Path name fields. If you use the Browse (…) button you can also select a shortcut to the application. In this case the application title and path name will be taken automatically via the shortcut if possible. After you have specified the application, check On run and/or On exit and choose the event (switch on or off).
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP NOTE: The On run event will take place when the first window of the selected application is opened. The On exit event will take place when the last window of the application is closed. HINT: Your device is an advanced standby-killer. Using this feature you can for example switch your scanner on/off whenever Photoshop is started/closed. To add a new file event, click the Add folder button (see Figure #13 above).
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP Specify the path to the folder you would like to monitor using the Browse (…) button or typing it manually in the Path name field. Specify the File name mask using wildcard characters: *, ?. Check then On placing and/or On removal checkboxes and select the event and delay. NOTE: The On placing event will take place when the first file matching the specified file name mask is placed into the specified folder.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP Figure #16 To remove the event, select it and click the Remove button (see Figure #13 above). You can select multiple events using Ctrl and Shift keys. You can also remove all events by clicking the Clear button HINT: Use the popup menu which can be activated by the right mouse button click over the table.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP 5. Managing EG-PMSU via your own software To let you switch the sockets from your own applications the following command line interface syntax is supported: pm.exe -[on | off] -device name -socket name Examples: "C:\Program Files\Energenie\Power Manager\pm.exe" -on -EG-PM -Socket1 "E:\Utils\PM3\pm.exe" -off -My EG-PM -Table lamp Execute pm.exe with -info key (pm.exe –info) to get the complete information about the status of the current devices.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP 6. Troubleshooting Problem The rocker switch turns off. The switching command is not carried out and indicators are not lit. Software reports "Device I/O request error" after switching Timer schedule is delayed Solution The load connected to the device is too high, some of the devices connected to the EG-PMSU should be disconnected before the rocker switch can be turned on. There is no power supply to the EGPMSU.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP 31 All brands and logos are registered trademarks of their respective owners
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP Waste disposal: Entsorgungshinweise: Do not deposit this equipment with the household waste. Improper disposal can harm both the environment and human health. For Information about waste collection facilities for used electrical and electronic devices, please contact your city council or an authorized company for the disposal of electrical and electronic equipment. Werfen Sie dieses Gerät nicht in den Hausmüll.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP WARRANTY CONDITIONS GARANTIE BEDINGUNGEN The receipt must clearly list the date of purchase and the part number, in addition it should be printed. Keep the receipt for the entire warranty period since it is required for all warranty claims. During the warranty period the defective items will be credited, repaired or replaced at the manufacturer's expense. Work carried out under the warranty neither extends the warranty period nor starts a new warranty period.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP GARANTIE VOORWAARDEN CONDITIONS DE GARANTIE Op de aankoopbon moeten de aankoopdatum en productomschrijving duidelijk vermeld staan. Gelieve de aankoopbon de gehele garantieperiode te bewaren, deze is ten alle tijden benodigd voor alle garantie aanspraken. Tijdens de garantieperiode zullen alle gebreken verholpen of vervangen worden door de fabrikant d.m.v. reparatie, omruiling van het defecte onderdeel of het gehele apparaat.
EG-PMSU ENERGENIE PROGRAMMABLE POWER STRIP ГАРАНТИЙНЫЙ ТАЛОН 1. Гарантийное обслуживание предоставляется в течение срока гарантии, при наличии правильно и четко заполненного гарантийного талона, и изделия в полной комплектации. Серийный номер и модель изделия должны соответствовать указанным в гарантийном талоне. 2. Гарантийное обслуживание представляет собой бесплатное устранение всех неполадок (ремонт), или замену изделия на новое (аналогичное). 3.