Use and Care Manual
11
IMPORTANT! READ AND FOLLOW ALL INSTALLATION AND MAINTENANCE INSTRUCTIONS, INCLUDING CLEANING
THE UNIT AS SPECIFIED, AND REPLACING GASKETS ANNUALLY, AND PARTS AS NEEDED.
ENGLAND’S STOVE WORKS IS NOT RESPONSIBLE FOR ANY DAMAGE OR INJURY INCURRED DUE TO NEGLECT,
OR DUE TO UNSAFE INSTALLATION OR USAGE OF THIS PRODUCT. CALL TECHNICAL SUPPORT WITH ANY
QUESTIONS.
INSTALLATION
ApprovedVentingMethod2:ThroughtheCeiling
x Ventingthroughtheceiling/roofmaybetheonlyfeasible
ventingoptioninsomecasesandisafactoryrecommended
installation.
x Wheninstallinganyventingsystem,TypeLorTypePLpipe
mustbeusedandallclearancestocombustibleslistedbythe
pipemanufacturermustbestrictlyadheredto.
x Usethepipemanufacturer’sapprovedceilingsupportfor
passingthroughacombustibleceiling,aswellastherequired
firestops,radiationshields,flashingandstormcollar.
x Becertaintofollowthemanufacturer’srequiredheightof
terminationabovetheroofline,andmaintainatleastthe
minimumclearancestocombustibles.
x Useanappliancecollarwherethepelletventconnectsto
theexhaustoutputofthepelletstoveandattachtheappliance
collartotheexhaustbloweroutputusingthreesheetmetal
screws.
x SealeachpipeconnectionjointwithhightemperatureRTVSilicone,toensurethesystemisleak
free(Checkwiththespecificpipemanufacturer’sinstructionsbeforedoingso).
x Ifthepelletventpipebeingusedisnota“TwistLock”system,three(3)sheetmetalscrewsare
requiredateachpipejoint.
x Connectthepelletstovetooutsidecombustionairusingthekitincludedwithyourstoveorusing
analternativemethod,asdescribedinthe“OutsideAir”section,onpage15.
x Thisventingmethodcanalsobemodifiedsothattheventingsystemrunshorizontallythroughthe
wallfromthestove,thentransitionstoverticalandterminatesabovetheroofline.Whenusingthis
modifiedversionofthisinstallationbecertaintocarefullyfollowtheventingsystem
manufacturer’sinstructionsdiligently.
Please Note:
Installation diagrams are for reference purposes only and are not drawn to scale, nor meant to be used as plans for each
individual installation. Please follow all venting system requirements, maintain the required clearances to combustibles,
and follow all local codes.
Forhighaltitudeinstallations
(above4,000ft.),theventpipe
shouldbeincreasedfrom3inch
(
3”
)
tofourinch
(
4”
)
.