Enphase IQ Microinverter System Planning Tech Brief

Table Of Contents
Planning for an IQ Microinverter System
© 2017 Enphase Energy Inc. All rights reserved. July 28, 2017
18
cabling on. Also, for AC Module installations, it is often more convenient to clip the Q Cable to the module
frame than to clip the Q Cable to the racking system (if available).
You must support the Q Cable and raw Q Cable at intervals not to exceed 6 feet and make sure that the
cable does not touch the roof surface.
Manufacturer
Model
Image
Nine Fasteners
DCS-1307 PV cable clip
DCS-1306 USE-2 cable clip
Burndy / Wiley Electronics
ACME ACC-PV PV cable clip
Heyco Products
SunRunner PV cable clip
Supporting the DC Module Leads
Prepare the modules using clips on the DC module leads to prevent the leads from resting on the roof. It is
best to prepare the modules on the ground, before installation. Install the wire clips and DC module leads to
allow for easy connection to the microinverter while also supporting the conductors off the roof.
Once the modules are prepared, install them on the racking. Secure any loose wires or cables to the module
frames with properly sized wire clips. Ensure that all conductors are supported off the roof.