Technical Brief for Installation of Consumption Monitoring
Table Of Contents
- Assessing a Site for Installation of Consumption Monitoring
- For North America and Latin America
- About the Enphase Envoy-S Metered
- About Consumption Monitoring
- Consumption Current Transformers
- Site Assessment Form
- Circuit Detail Form
- 200A Consumption CT Dimensions
- Location of the Envoy-S Metered
- Installation of Consumption CTs
- Installing CTs in a simple scenario
- Installing CTs in Eaton Service Panels / Solar Power Center
- Installing Multiple Conductors in a Single CT
- Installing Parallel Connected CTs for 400A Services and Crowded Service Panels
- Calculating Whether Multiple Conductors Fit Within a CT
- Example Calculations for a Service Panel
- Retrofitting the Electrical Service for CT Installation
- Extending the Consumption CT Conductors
- Net Consumption versus Total Consumption
- Monitoring with the Installer Toolkit Mobile App
- Troubleshooting
- Viewing Sites with Consumption Monitoring
TECHNICAL BRIEF
2016 Enphase Energy Inc. All rights reserved. January 2016
1
Assessing a Site for Installation of Consumption Monitoring
For North America and Latin America
About the Enphase Envoy-S Metered
The Enphase Envoy-S Metered™ communications gateway enables performance monitoring and remote
software and firmware updates of an Enphase Microinverter System. In addition, the Envoy-S Metered
provides revenue-grade production data and allows for the monitoring of a site’s energy load, thus offering
significant advantages over other PV system monitoring equipment. Users can access energy production
and consumption data through Enphase Enlighten™ cloud based monitoring software.
To perform both revenue grade production and energy consumption monitoring, the Envoy-S Metered
requires current transformers (CTs). This document provides guidance on assessing a site’s potential for
monitoring and includes additional tips to help with CT installation. For assistance with revenue grade
production monitoring, please refer to the Enphase Envoy-S Installation and Operation Manual.
Enphase recommends that an installer or site assessor verify that the site can easily accommodate
consumption CTs before approving consumption monitoring as part of the project.
The Envoy-S installs in most single-phase photovoltaic systems. For sites where consumption monitoring
cannot be readily accommodated, this document provides a list of potential modifications to the service
wiring to allow for consumption monitoring.
About Consumption Monitoring
Consumption monitoring is not required for a typical Enphase System installation, although consumption
data is useful in helping a system owner better understand their energy usage related to their Enphase
System production. Determining energy consumption is critical for homes that require zero export of
Enphase System production to the grid or for potential customers of the Enphase AC Battery™.
Site energy consumption and production shown in MyEnlighten
• Dark Blue: Solar production exported to grid
• Light Blue: Solar production consumed on site
• Dark Orange: Energy purchased from the utility
• Light Orange: Consumption offset by solar
Consumption Current Transformers
Consumption monitoring requires installation of two consumption monitoring CTs on the main service
conductors feeding the site. At some sites, the conductors or bussing feeding the main breaker of the service
panel are not accessible or do not allow for adequate spacing.