Enphase Microinverter Installation
Installing the Enphase IQ Series Micros involves several key steps. Each step listed here is detailed
in the following pages.
Step 1: Position the Enphase IQ Cable
Step 2: Position the Junction Box
Step 3: Mount the Microinverters
Step 4: Create an Installation Map
Step 5: Manage the Cabling
Step 6: Connect the Microinverters
Step 7: Terminate the Unused End of the Cable
Step 8: Complete Installation of the Junction Box
Step 9: Connect the PV Modules
Step 10: Enphase Energy System Configurations
Horizontal Mount
Vertical Mount
Step 1: Position the Enphase IQ Cable
A. Plan each cable segment to allow drop connectors on the Enphase IQ Cable to align with each PV module.
Allow extra length for slack, cable turns, and any obstructions.
B. Mark the approximate centers of each PV module on the PV racking.
C. Lay out the cabling along the installed racking for the AC branch circuit.
D. Cut each segment of cable to meet your planned needs.
WARNING: When transitioning between rows, secure the cable to the rail to prevent cable damage or
connector damage. Do not count on connector to withstand tension.
Enphase IQ
Cable