Enphase IQ8 Install and Operation Manual

IQ8 / IQ8+ / IQ8M / IQ8A / IQ8H Micro Installation and Operation
15 © 2022 Enphase Energy Inc. All rights reserved. Aug 2022
Each Enphase Microinverter, IQ Gateway, and IQ Battery have a removable serial number label. Build the installation
map by peeling the serial number labels from the microinverter mounting plates and placing the labels on the map. You
will also place the Enphase IQ Gateway and IQ Battery serial number on the map after installation.
After you have created the installation map, use the Enphase Installer App mobile app to record serial numbers and
configure the system.
For details, refer to “Detect the Microinverters” in the help topics of the Enphase Installer app.
A. Peel the removable serial number label from each microinverter and affix it to the respective location on the
paper installation map.
B. Peel the label from the IQ Gateway and any Enphase IQ Battery, if installed) and affix it to the installation map.
C. Always keep a copy of the installation map for your records.
Step 5: Manage the Cabling
A. Use cable clips or tie wraps to attach the cable to the racking. Leave no more than 1.8 m (six feet) between
cable clips or tie wraps.
B. Dress any excess cabling in loops so that it does not contact the roof. Do not form loops smaller than 12 cm
(4¾ “) in diameter.
WARNING: Tripping Hazard. Loose cables can become a tripping hazard. Dress the Enphase IQ Cable to
minimize this potential.
Step 6: Connect the Microinverters
A. Connect the microinverter. Listen for a click as the connectors engage.
B. Cover any unused connector with Enphase Sealing Caps. Listen for a click as the connectors engage
Affix serial number labels
Cable clip