Step 1: Plan the Connections
Plan for the following connections:
One maximum 60 A home run: Pass the home run cable through wet/dry-rated conduit gland,
and secure in the cage clamp lugs to the terminal connectors. Use standard home run
conduit size (1/2, 3/4, or 1-inch).
Up to three 20A (NA) branch terminations: Three bulkhead mounted connectors allow for the
direct connection of the AC trunk connector.
PV Array ground: The ground lug connection that passes through the enclosure allows you to
connect racking and module ground to the main panel ground.
Step 2: Plan the Location
A. Select a location that will be under the modules when the array is complete, but that will also be
accessible for making connections later.
B. Ensure that you can bring conduit into the Q Aggregator from the upper left or right side where
indicated by pilot hole indents.
Step 3: Drill a hole for Conduit
A. Prep conduit with an offset to approximate area and position the Q Aggregator to double check
your drill location.
B. Remove the Q Aggregator cover and drill a hole for up conduit. Typical openings are 1.3 cm, 1.9
cm, or 2.5 cm (0.5”, 0/75”, or 1/0”).
WARNING: Take care not to damage the circuit board.
C. Dump or blow out any debris from this drilling operation.