Install Manual
Table Of Contents
- SAFETY
- The Enphase Envoy-S
- Installation Planning and Preparation
- Installing the Envoy-S
- Activate Monitoring
- Envoy-S Operation
- Connecting to Envoy-S
- Troubleshooting
- Technical Data
Envoy-S Installation and Operation
2015 Enphase Energy Inc. 141-00027 Rev 01
8
Plan the Internet Connection
To use the Enlighten web-based monitoring and analysis software, additional requirements are:
Internet connection for the Envoy-S through a traditional router or modem or Enphase Mobile
Connect (Enphase model CELLMODEM-01). Decide whether to connect the Envoy-S to the
Internet using integrated Wi-Fi, an Enphase Mobile Connect modem, or using a PLC bridge with
Ethernet cables.
One of the following Web browsers with cookies enabled: Chrome 5 or higher, Firefox 11 or
higher, Internet Explorer (IE) 9 or higher, or Safari 5 or higher
Download the Installer Toolkit
The Enphase Installer Toolkit is a mobile app for iOS and Android devices that allows
installers to configure the system while onsite, eliminating the need for a laptop and
improving installation efficiency.
Download the Enphase Installer Toolkit mobile app and open it to log in to
your Enlighten account. With this app, you can connect to the Envoy to
track system installation progress. To download, go to
enphase.com/installer-toolkit or scan the QR code:
To run the Installer Toolkit app, you need either of the
following mobile devices:
An Android mobile device running Android
version 4.2 or later, or
An iOS device running iOS 7.0 or later, specifically an iPhone 4
or later or an iPod Touch 5th generation
Metering Considerations
To install the production CT
Ensure there is sufficient room to install the production CT around line 1 of the solar PV
disconnect.
Do not install the CTs in a panel where they exceed 75% of the wiring space of any cross-
sectional area within the panel.
To install consumption CTs (order CT-200-SPLIT separately)
For net consumption metering, ensure there is sufficient room to install both CTs around lines 1
and 2 from the main feeds.
For total consumption metering, ensure there is sufficient room to install the CTs around the
lines that feed the consumption circuit.
Do not install the CTs in a panel where they exceed 75% of the wiring space of any cross-
sectional area within the panel.
Box Contents
Check the shipping box for the following items:
Enphase Envoy-S
AC power cord (included with ENV-S-AB-120-A)
Production metering CT (included with ENV-S-AM1-120)
Length of DIN rail for mounting
Ferrite bead to attach to your Ethernet Cable, if used
Enphase Envoy-S Quick Install Guide
Enphase Installer
Toolkit mobile
app