Installation Manual

IQ 6/IQ 6+ Micro Installation and Operation
© 2017 Enphase Energy Inc. All rights reserved. 141-00034-01
15
Parts and Tools Required
In addition to the microinverters, PV modules, and racking, you will need the following:
Enphase Equipment
Enphase IQ Envoy communications gateway (ENV-IQ-AM1-240) required to monitor solar
production. For installation information, refer to the Enphase IQ Envoy Installation and
Operations Manual.
Enphase Installer Toolkit
Download the Enphase Installer Toolkit mobile app and open it to log in to your
Enlighten account. With this app, you can scan microinverter serial numbers and
connect to the IQ Envoy to track system installation progress. To download, go to
enphase.com/toolkit or scan the QR code at right.
Tie wraps or Q Cable Clips (Q-CLIP-100)
Enphase Sealing caps (Q-SEAL-10) for any unused drops on the Enphase Q Cable
Enphase Terminator (Q-TERM-10) typically two needed per branch circuit
Enphase Disconnect Tool (Q-DISC-10)
Enphase Q Aggregator (Q-BA-3-1P-60) for multiple branch circuits (optional)
Field Wireable Connectors (male and female: Q-CONN-10M and Q-CONN-10F)
Enphase Q Cable:
Cable Model
Connector Spacing
PV Module
Orientation
Connector Count per
box
Q-12-10-240
1.3m
Portrait
240
Q-12-17-240
2.0m
Landscape (60-cell)
240
Q-12-20-200
2.3m
Landscape (72-cell)
200
Other Items
Number 2 and 3 Phillips screwdrivers
A 27 mm open-end wrench or channel lock pliers for terminators
Torque wrench, sockets, wrenches for mounting hardware