IQ7+ Micro Installation
Table Of Contents
- Important Safety Information
- The Enphase IQ System
- Planning for Microinverter Installation
- Parts and Tools Required
- Enphase Microinverter Installation
- Step 1: Position the Enphase Q Cable
- Step 2: Position the Junction Box
- Step 3: Mount the Microinverters
- Step 4: Create an Installation Map
- Step 5: Manage the Cabling
- Step 6: Connect the Microinverters
- Step 7: Terminate the Unused End of the Cable
- Step 8: Complete Installation of Junction Box
- Step 9: Connect the PV Modules
- Step 10: Energize the System
- Set Up and Activate Monitoring
- Troubleshooting
- Technical Data
IQ 7 / IQ 7+ / IQ 7X Micro Installation and Operation
© 2018 Enphase Energy Inc. All rights reserved. 141-00043-02
29
Enphase Q Cable Accessories
The Enphase Q Cable is available with several accessory options for ease of installation, including:
• Field wireable connectors (male): (Q-CONN-10M) Make connections from any Field Wireable
female connector
• Field wireable connectors (female): (Q-CONN-10F) Make connections from any Q Cable open
connector or Field Wireable male connector
• Cable clips: (Q-CLIP-100) Used to fasten cabling to the racking or to secure looped cabling
• Disconnect Tool: (Q-DISC-10) Disconnect tool for Q Cable connectors, DC connectors, and AC
module mount
• Q Cable sealing caps (female): (Q-SEAL-10) One needed to cover each unused connector on
the cabling
• Terminator: (Q-TERM-10) Terminator cap for cut cable ends