The table below shows a timeline from system shutdown until the point when all loads are
powered back on. Note that this table assumes all loads can be successfully powered on
the rst try, post system restart. The sequence below will repeat if there are successive
failures. If any load causes up to ve system shutdowns that load will be skipped, and the 22
seconds delay associated with that load will also be skipped during the next system restart.
Consider a system with the following loads:
EVENT
TIME TAKEN (HOURS:
MINUTES: SECONDS)
TIME ELAPSED SINCE
SYSTEM SHUTDOWN
(HOURS: MINUTES: SECONDS)
System shutdown/Microgrid collapse N/A 00:00:00
System restart with highest priority loads powered on
IQ8 Microinverters restart and provide
240V output
Wi-Fi router + Modem is powered on
00:00:52 to 00:01:57 00:00:52 to 00:01:57
Refrigerator is powered on 00:00:22 00:01:14 to 00:02:19
Kitchen lights is powered on 00:00:22 00:01:36 to 00:02:41
Microwave is powered on 00:00:22 00:01:58 to 00:03:03