Step 4: Mount the Q Aggregator
WARNINGS:
Install the Q Aggregator under the PV module to avoid direct exposure to rain, UV, and other
harmful weather events.
Mount the Q Aggregator off of the roof surface for rain and snow resistance.
Always install the Q Aggregator with the lid side up. Do not mount it upside down.
When transitioning between rows, secure the cable to the rail to prevent cable damage.
A. Install Q Aggregator on rail. Allow a minimum of 1.9 cm (0.75) between the roof and the Q
Aggregator. Also allow 1.3 cm (0.50) between the back of the PV module and the top of the Q
Aggregator.
B. Install the Q Aggregator on the rail and mount loosely.
C. Use a conduit fitting rated for outdoor use to secure the conduit to the Q Aggregator.
D. Provide an AC connection (home run) from the Enphase Q Aggregator back to the electricity
network connection using equipment and practices as required by local jurisdictions.
E. Tighten rails connections to 80 in-lbs. (9 N m), and make sure that conduit fittings are secured
and water tight.
F. Secure and check all connections.
Step 5: Wire the Q Aggregator
A. Pull the line ground conductors up to the Q Aggregator.
B. Strip the two line conductors (18 mm/0.7” strip length) using the guide on the upper surface of the
cage clamp style main lugs.
C. Secure the conductors (12 AWG to 4 AWG max) in these lugs and make sure that the orange
handles are fully in the down position.
D. Strip and bring the ground wire inside the Q Aggregator to the ground lug. This ground lug passes
through to outside.
E. Torque ground connections as follows:
14-10 AWG / 20 in-lbs. (2.25 N m)
8 AWG / 25 in-lbs. (2.82 N m)
6-4 AWG / 35 in-lbs. (3.95 N m)
F. Secure racking ground to the ground lug.
G. Check your connections for soundness.
You have completed the wiring for up to three plug and play branch circuits in your system.