IQ Disconnect Tool Manual

IQ 6/IQ 6+ Micro Installation and Operation
© 2017 Enphase Energy Inc. All rights reserved. 141-00034-01
44
C. Attach the terminals to the cable:
Strip the outer jacket to 32 mm (1.25 in.) and strip the inner insulation to 9.5 mm (3/8 in.).
Load the open end of each terminal in the 12 gauge slot of the crimp tool, flush with the edge
of the slot.
Crimp the end of the terminal over the stripped copper wires.
Do NOT crimp over insulation.
D. Insert terminals into connector body. Each terminal should click into place.
E. Assemble connector body and cover. Listen for a click as they engage.
F. Tighten the nut to 7 Nm using channel lock pliers.