Data Sheet
Table Of Contents
- Planning for an IQ Microinverter System
- IQ 6 and IQ 6+ Micros
- IQ 7 and IQ 7+ Micros
- IQ 7X Micros
- Q Cable and IQ Micro Accessories
- IQ System Design using the IQ Combiner
- IQ System Design using the IQ Combiner+ and IQ Combiner 3
- IQ System Design with Q Aggregator
- IQ Envoy Installation Options
- Field Wireable Q Connectors and Raw Q Cable
- Splicing Q Cable and Raw Q Cable with Junction Boxes
- Example IQ Microinverter System Layouts and Bill of Materials (BOMs)
- Wire Management of AC and DC Cables Under Array
- AC Wire Management at the Junction Box or Q Aggregator
- Installing IQ Microinverters with Frame Mount Bracket
- Installing the Power Line Filter (Q-LCF-064-1P)
Planning for an IQ Microinverter System
© 2018 Enphase Energy Inc. All rights reserved. December 13, 2018
7
Sealing Caps
You must seal each unused Q Cable connector with a watertight sealing cap (Q-SEAL).
Seal each unused connector on the Q Aggregator with a male sealing cap. Also, during construction, you
must use male sealing caps to temporarily seal any exposed IQ Micro connectors, that are not connected to
the Q Cable, to protect against moisture or water damage at the exposed connector.
Q Terminator
Install a terminator (Q-TERM) on any cut end of Q Cable that is not terminated with a Field Wireable Q
Connector.
Male connector on Q Cable
Female Sealing Cap (Q-SEAL)
Male Sealing Cap
(Q-BA-CAP)
Q Terminator on each cut end of
Q Cable