Installation Instructions

Ensemble Communications Inc.
3-2
Operator’s Guide to the Fiberless System
Site Preparation
Site preparation time varies, depending on the particular site. For
example, installation in a new location may require building
modifications, while an existing building would not.
Licenses and Permits Verify all licensing and permit issues. Such issues may include:
Import/export licenses for the site country
Radio licenses, both station license and frequency license
Other permits may also be required, depending on location. Some
typical examples include:
Landlord approval of plans for the pending construction
Construction permits
Electrical permits
Zoning or use permits for the proposed facility and examina-
tion of possible impact on neighboring areas
Note When placing antennas near airports, it may be necessary to obtain
authorization from the appropriate aviation authorities.
Location Guidelines Verify that the selected locations are accessible to installers and
equipment.
Verify that all utilities and services, including AC power, are
available.
Verify that lightning protection and grounding systems are
available and comply with local building codes.
If prime AC power needs to be installed, use a licensed electri-
cal contractor. Verify all components are installed in accordance
with local electrical codes.