Installation Instructions

Ensemble Communications Inc.
3-4
Operators Guide to the Fiberless System
Installation Tips Installers are responsible for determining the proper attachment
method. The following are suggestions regarding cabinet and rack
installations.
WARNING
Do not place any equipment in the cabinet or rack without
first securing it to the floor.
For concrete floors, use threaded rods with washers and nuts
or the proper length and diameter machine bolts with concrete
insert anchors.
Move the cabinet or rack into position and mark the attach-
ment location in each corner on the floor. Move the cabinet or
rack out of the way, then drill the appropriate size hole in the
floor for the anchor being used.
Install four anchors into the floor following manufacturer
instructions.
Vacuum the floor to remove all dust and debris.
Move the cabinet or rack back into place and secure the four
corners.
ODU Guidelines Verify that the mounting mast was installed according to con-
struction drawings and local construction codes and practices.
Mounting masts are typically a section of 2-inch (5 cm) to
4-inch (10 cm) pipe.
Verify cable route from the base station or CPE to the ODU. It
can be no longer than 1,000 feet (300 meters). This may be a
duct or conduit. If required, install a dedicated conduit
between the ODU and base station location. A 1-inch (2.5 cm)
to 2-inch (5 cm) conduit is recommended, depending on the
number of ODU cables being installed.
Install a ground plate and lightning suppressor at the building
entry point and at the ODU.
Prepare all mounting hardware for the base station.
Verify the power system and wiring for the base station,
including the cabling, grounds, circuit breakers, and fuses.