IP1812EN Ditec CUBIC Technical Manual Swing gates automation (Original instructions) www.ditecentrematic.
Index Subject 1. Page General safety precautions 21 General safety precautions for the user 22 Declaration of incorporation of partly completed machinery 23 Machinery Directive 23 Technical specifications 24 Operating instructions 24 4. Standard installation 25 5. Examples applications 26 6. Installation 27 2. 2.1 3. 3.1 6.1 Preliminary checks 27 6.2 Foundation case installation 27 6.3 Lever mechanisms installation 27 6.4 Wing release installation 27 6.
1. General safety precautions IP1812EN - 2015-05-22 Failure to respect the information given in this manual may cause personal injury or damage to the device. Keep these instructions for future reference This installation manual is intended for qualified personnel only. Installation, electrical connections and adjustments must be performed by qualified personnel, in accordance with Good Working Methods and in compliance with the current regulations.
These precautions are an integral and essential part of the product and must be supplied to the user. Read them carefully since they contain important information on safe installation, use and maintenance. These instructions must be kept and forwarded to all possible future users of the system. This product must only be used for the specific purpose for which it was designed. Any other use is to be considered improper and therefore dangerous.
2. Declaration of incorporation of partly completed machinery (Directive 2006/42/EC, Annex II-B) The manufacturer Entrematic Group AB, with headquarters in Lodjursgatan 10, SE-261 44 Landskrona, Sweden, declares that the automation for swing gates type Ditec CUBIC6-CUBIC6H��������������� -CUBIC6HV: - is designed to be installed on a manual gate to form a machine pursuant to Directive 2006/42/ EC.
3.
4. Standard installation 7 2 3 7 6 5 A 6 4 7 1 Ref.
5.
6. Installation Unless otherwise specified, all measurements are expressed in millimetres (mm). 6.1 Preliminary checks Check that the structure is sufficiently sturdy and that the hinge pivots are properly lubricated. Provide an opening and closing stop. Note: if the gate wing is more than 2.5 m wide, an electric lock should be installed. 6.2 Foundation case installation Install the foundation case as indicated in the relevant manual. 6.
6.6 Installation with CUBIC6L-CUBIC6LG Insert lever [A] on the gearmotor and position the mechanical stop [B] and [C] and adjust it, as shown in the figure. NOTE: the figure shows the motor installed on the right door wing. A B C 6.7 Installation with CUBIC6TC Insert pinion [A] and join the two pinions by means of the chain [B], as shown in the figure. Lubricate the chain and the lever mechanism as indicated in the figure. A WARNING: fasten the motor to the foundation case after connecting the chain.
6.8 CUBIC6FM installation It is possible to limit the travel of the wing by means of magnetic limit switches. Choose and install the magnetic limit switches as indicated in the relative manual. Make the electrical connections as shown in the control panel. WARNING: the magnetic limit switches cannot interrupt the power supply to the motor. 7. Electrical connections IP1812EN - 2015-05-22 Before connecting the power supply, make sure the plate data correspond to that of the mains power supply.
8. Routine maintenance plan IP1812EN - 2015-05-22 Perform the following operations and checks every 6 months according to intensity of use of the automation. Without 230 V~ power supply and batteries if present: Lubricate the levers of the gearmotor. Lubricate the rotation pivot of the gate leaf. Lubricate the gate leaf hinges. Check the good conditions of the electric connection. Check that the fixing screws of the gearmotor are firmly tightened.
Operating instructions IP1812EN - 2015-05-22 DETACH AND DELIVER TO THE CUSTOMER General safety precautions for the user These precautions are an integral and essential part of the product and must be supplied to the user. Read them carefully since they contain important information on safe installation, use and maintenance. These instructions must be kept and forwarded to all possible future users of the system. This product must only be used for the specific purpose for which it was designed.
IP1812EN - 2015-05-22 DETACH AND DELIVER TO THE CUSTOMER Cleaning and maintenance work must not be carried out by children unless they are supervised. To ensure that the system works efficiently and correctly, the manufacturer’s indications must be complied with and only qualified personnel must perform routine maintenance on the motorised door or gate. In particular, regular checks are recommended in order to verify that the safety devices are operating correctly.
Manual release instructions IP1812EN - 2015-05-22 DETACH AND DELIVER TO THE CUSTOMER Fig. 1 Fig. 2 In the event of failure or if there is no voltage: CUBIC6SBL: insert the lock release lever and rotate by 180° (fig.1). Release any electric lock. Manually open the gate. CUBIC6SBD: insert the lock release key in the lock and rotate by 180° (fig.2). Release any electric lock. Manually open the gate. To block the door wings again: rotate the lock release lever or key by 180°.
IP1812EN - 2015-05-22 Entrematic Group AB Lodjursgatan 10 SE-261 44, Landskrona Sweden www.ditecentrematic.