MAC-T Ceiling Grid System 2” Heavy Duty for Cleanroom OPERATION & MAINTENANCE MANUAL Envirco Technical Support: 800-884-0002
MAC-T Ceiling Grid System 2” Heavy Duty for Cleanroom Installation & Service Manual Table of Contents Introduction........................................................................................................................ 3 Tools.................................................................................................................................. 3 Uncrating, Inspection, and Inventory................................................................................. 3 Notes...........
MAC-T Ceiling Grid System 2” Heavy Duty for Cleanroom Installation & Service Manual ■ Introduction Envirco offers the T-Grid 2” Gasket Seal Grid Cleanroom Ceiling System with superior materials that provides a structural grid system and zinc alloy die-castings. The materials are packaged with care, but check for damage that may have occurred during transit. Please inspect the shipment and quantity before beginning installation. Please notify us promptly if you experience any problems at 800.884.0002.
MAC-T Ceiling Grid System 2” Heavy Duty for Cleanroom PART NO. 267324-007 Installation & Service Manual 267324-003 ■ DESCRIPTION REV. Part Numbers A and Extrusion Guide DATE RCH 7/25/13 Identify various parts from reference drawings on Page RCH5. 3.300 3.300 ECN-52076A. 5.975 PART NO. 267324-001 ION V. RE P/N: 267324-007 P/N: 267324-008 PART NO. 267324-007 A A. 76 20 -5 CN E PART NO. 3.300267324-008 5.975 T RIP SC DE TIO RIP SC DE V. RE A EC P/N:NO.
MAC-T Ceiling Grid System 2” Heavy Duty for Cleanroom Installation & Service Manual ■ Diagram # P/N Description 4 MAC 10 T-GRID COMPONENTS 1 267322-001 MT240-Main Runner 20ft 1 267322-002 MT240-Main Runner 10ft 1 267322-003 MT240-Main Runner 8ft 1 267322-004 MT240-Main Runner 6ft 2 267322-005 CT46.5 Cross Tee 46.5” 2 267322-006 CG22.5 Cross Tee 22.
MAC-T Ceiling Grid System 2” Heavy Duty for Cleanroom Installation & Service Manual ■ Installation of Wall Angle The first component to be installed is the wall angle. Attach lengths of wall angle to walls using appropriate fasteners for the type of existing wall. It is advisable to pick one wall as a starting point and begin attaching wall angle from the center of the wall towards the corners. A laser or other suitable leveling tool should be used to assure a consistently level finished product.
MAC-T Ceiling Grid System 2” Heavy Duty for Cleanroom Installation & Service Manual ■ Installation of Light and Filter Fixtures Once the ceiling grid is installed, the fixture installation can begin. If “lay-in” light fixtures are to be used, they should be installed first in order to make the wiring easier. Once the light fixtures are in place and wired, the filter modules can be installed.
Clean air solutions built for you. MORE INFORMATION AVAILABLE AT W W W . E N V I R C O .