Operating instructions

PEDESTAL AND LEG INSTALLATION
Please read and understand these instructions before installing ash pan and leg option.
Failure to follow these instructions carefully could cause personal injury or property damage.
All screws are pre installed on the base of the unit.
PEDESTAL
Remove the bricks from the unit before
starting.
Loosen the two carriage bolts that secure
the unit to the pallet. Slide the pallet towards
the front to release carriage bolts from the
key holed slots in the unit. Place the unit on
the pallet on its back.
Slide the pedestal assembly over the bolts
located on the base of the unit using the key
holed slots provided.
Tighten all four bolts ensuring the pedestal
is properly aligned to the edges of the unit.
Ensure that the gasket material is properly
sealed before continuing.
Stand the unit on the pedestal and set the
unit in the location ready for installation.
If fresh air supply is being supplied from the
bottom of the unit please install the cover
plate supplied to the rear of the pedestal
covering the 4” inch hole.
LEGS AND ASH PAN
Place the unit on the pallet on its
back.
Slide the ash pan assembly over the
bolts using the key holed slots
provided and tighten all four bolts.
Ensure that the gasket material is
properly sealed before continuing.
Carefully remove the cast iron legs
from the packaging and secure each
leg with two bolts provided.
Secure all four legs, push the leg
towards the center of the stove and
align the legs with the outer edges of
the firebox.
Stand the unit on the legs and set the
unit in the location ready for
installation
7