Owner`s manual

Maintenance And Service
fueL conVeRsion:
TO BE INSTALLED BY A QUALIFIED SERVICE AGENCY ONLY
Please read and understand these instructions before installing.
Figure 11: Removing
valve cap.
a)Removethemainburneroricewitha½inchdeepsocket.
b)Putabeadofpipe-threadsealantorapprovedTeontapeontheorice
threadsbeforeinstallingintothebrasselbow.
c)Installtheneworice(s)fromthekitintothebrasselbow.
6. Convertthepilotinjector:
a)Pullthepilothoodstraightuptoaccessthepilotinjector.
b)Usinga
5
/32” or 4 mmAllenkey,removethepilotinjector.
c)Installthenewpilotinjectorsuppliedwiththisconversionkit.Simplyscrew
thenewinjectorinsidethepilothoodusingtheAllenkey,
d)Reinstallthehoodbyplacingthehoodontheassembly,lineupthekey
way,andsnapintoplace.
7. ConverttheSITgasvalve:
a) RemovetheblackprotectioncapfromtheHI/LOknobbyhandshownin
Figure11.
11
Warning: This conversion kit shall be installed by a qualied service agency in accordance
with the manufacturer’s instructions and all applicable codes and requirements of the
authority having jurisdiction. If the information in these instructions is not followed
exactly, a re, explosion or production of carbon monoxide may result causing property
damage, personal injury or loss of life. The qualied service agency is responsible for
the proper installation of this kit. The installation is not proper or complete until the
operation of the converted appliance is checked as specied in the manufacturer’s
instructions supplied with the kit.
Kit Parts List for Sienna:
1-Orice(NG#32DMSorLP#49DMS)
1-PilotInjector(NG0.62mm;LP0.35mm)
1-Installationinstructionsheet
1-Conversionlabel
Carefully inspect all parts supplied with this conversion kit. If any parts have been damaged or are
missing,contactyourdealer,distributororcouriercompanytohavethemreplacedbeforestartingthis
installation.
Conversion Kit Installation:
1. Turncontrolknobonthegasvalvetothe“OFF”positionandshutthegassupplyoffattheshut-off
valveupstreamoftheunit.CAUTION:Thegassupplymustbeshutoffpriortodisconnectingthe
electricalpowerandbeforeproceedingwiththeconversion.Allowthevalveandunittocooldown
to room temperature.
2. RemovetheglassasshowninthemaIntenance anD serVIce - glass Door remoVal.
3. Carefullyremovethelogsetandembermaterialiftheyareinstalled.
4. RemovetheburnerasshowninthemaIntenance anD serVIce - burner anD blower remoVal.
5. Converttheburnerorice(s):