Owner`s manual

12
Maintenance And Service
b) Insert a
5
/32” or 4 mm Allen wrench into the
hexagonalkey-wayofthescrew(seeFigure12),
rotate it counter-clockwise until it is free and
extractit.
c) Check that the screw is clean and if necessary
removedirt.
d) Flipthescrew(refertoFigure13).
e) Using the Allen wrench as shown in Figure 12,
rotatethescrewclockwiseuntilatorqueof9inch
lbs.WARNING!Donotovertightenthescrew.
Itisrecommendedthatyougripthewrenchby
theshortside.
f) VerifythatiftheconversionisfromNGtoLPG,
thescrewmustbere-assembledwiththeredo-
ringvisible(refertoFigure14).Iftheconversion
isfromLPG to NG,thered o-ring ofthescrew
mustbenotvisible.
Figure 13: Flip valve
screw.
Red o-ring
is not visible
Red o-ring
is visible
LPG Configuration
g) Re-attach the black protection
cap that was removed in step a
(Figure11).
8. Reinstall the burner, brick panels,
logset,embers,andglassdoor.Also
refer to seconDary InstallatIon -
InstallIng log set anD embers. When
re-installingtheburner,ensurethat
theburnertopilothoodrelationship
Figure 14: O-ring on valve screw.
issimilartowhatisshowninFigure15.Onsomeunitsyouwillneed
to payspecialattentionwheninstallingtheburnerthattheventuri
adjustmentrodisproperlyinstalledintotheventuriadjustmentpiece
weldedtotheburnerventuritube
9. Reconnect the main gas line if it was disconnected and open the
shut-offvalveatthegaslinetotheunit.
10.Useasmallbrushtoapplyawarmsoapywatersolutiontoallgas
connections(usehalfdishsoapandhalfwarmwater).Ifagasleak
ispresent,bubbling will occur. Gas leakscanbe repaired by using
an approved pipe thread sealant or approved Teon tape. NEVER
USE AN OPEN FLAMEWHEN TESTING FOR LEAKS. Check the gas
Loosen
Tighten
Figure 12: Removing valve
screw.
pressureoftheappliance,refertoInItIal InstallatIon - gas lIne connectIon andTable5.
11. Reconnect the electrical power to the unit.
12. Lightthepilotandcheckforproperames(seeFigure4).Lighttheburnerinbothhighandlow
settingstoverifyproperburnerignitionandoperationandproperameappearance.Theamount
ofairtotheventurimayneedtobeadjustedusingtherodundertherebox(refertooperatIng
InstructIons - aDjustIng VenturI aIr settIngs). Also refer to Figure 37 for a ame appearance
picture.
13. MAKESUREthattheconversionlabelisinstalledonorclosetotheratinglabeltosignifythatthe
unithasbeenconvertedtoadifferentfueltype.
Figure 15: Burner to pilot hood
relationship.