Owner`s manual

Initial Installation
QUALIFIED INSTALLERS ONLY
conVeRting a DiRect Vent fiRePLace to a b-Vent fiRePLace:
Direct Vent
Connector Assembly
Fresh Air
Inlet Covers
1. Remove the Direct Vent
chimney connector assembly
bytakingoutthetwo(2)T-20
screws at the front of the unit.
Push the assembly out from
underthebracketsattheback
andremove(seeFigure24).
2.Remove the two (2) fresh air
inlet covers from each side.
Cover locations shown in
Figure25.
3.Slide the B-Vent chimney
connector assembly into the
same position the Direct Vent
chimney connector assembly
was in. Ensure the tabs are
underthebracketsattheback
andtheholesatthefrontline
up.Secureintoplacewiththe
two (2) T-20 screws at the
front of the unit.
4.Disconnect the two (2) blue
wires at the opening to the
right of the unit and connect
them to the 300°F (149°C)
manual reset spill switch at
the rear of the B-Ventchimney
connector with the wires
supplied.RefertoFigure26.
5.Test re the appliance and
ensure proper operation. A
venturi adjustment could be
requiredtoachieveanefcient
ame. Improper operation
or adjustment could result in
Carbon Monoxide production
causing personal injury or
propertydamage.
Figure 25: Converting to a BV replace.
B-Vent
Connector Assembly
300°F (149°C)
manual reset
spill switch
Figure 26: Converting to a BV replace.
20