TERMINATION:
  

  
  

  

   
Figure 13: Height of Vertical Termination.
The bottom of the vent cap shall extend at
least 2 ft (61 cm) above the highest point
of the roof where it passes through and at
least 2 ft (61 cm) higher than any portion
of the roof within a horizontal distance of
10 ft (3.1 m).
See vent manufacturer’s instructions for
vent system clearances to combustibles
and vent terminal clearance from roof.
INSTALLATION INTO AN EXISTING CHIMNEY:
Figure 14: Installation into an existing
chimney.
This basic venting conguration shown are rough
guidelines only. Follow national and local codes for other
installation options.
Measure the height of the chimney beforehand and
purchase the appropriate kit. Never attempt to over
stretch a exible liner to accommodate the height of the
chimney.
Any ue damper must be removed or locked permanently
in the open position.
The chimney must be clean, in good working order and
constructed out of non-combustible materials.
Make sure that all chimney clean-outs are tightly tting
and will not permit air to leak into the chimney.
Make all gas connections and check for leaks.
See vent manufacturer’s instructions for vent system
clearances to combustibles and vent terminal clearance
from roof.
14
Initial Installation
QUALIFIED INSTALLERS ONLY