Specifications
2 ft
(61 cm)
Rain Cap (ensure cap 
is at least 3ft (91cm) 
above the roof at the 
lowest point)
Roof Flashing
Roof Rafter
Fire Stop with 
Support Collar
Ceiling Joist
Vertical Vent Pipe
Clean Out Tee with 
Pipe Adapter
NOTE: All vent sections must 
maintain 3 inches (7.6 cm) 
clearances to combustibles.
Installation
inSide vertical inStallationS:
1. Place the unit on the hearth pad if a hearth pad is to be used (or on solid material if installed on a 
carpeted surface) and space the unit in a manner so when the pellet vent is installed vertically, it will 
be 3” (7.6 cm) away from a combustible wall.
2. Install the tee with clean out.
3. Install  the  pellet  vent  upward  from  there.  When  you  reach  the  ceiling,  make  sure  that  the  vent 
goes through the ceiling fire stop. Maintain a 3” (7.6 cm) distance to combustibles and keep attic 
insulation away from the vent pipe. Maintain an effective vapor barrier. Follow the Vent manufacturer’s 
instructions.
4. Finally, extend the pellet vent to go through the roof flashing.
5. Ensure that the rain cap is approximately 24” (60 cm) above the roof. 
6. Install the fresh air system.
Figure 16: Inside Vertical Installation. 
15










